Main Page Organization Projects Studies Project Conducted Research Projects

Main Menu

done research projects PDF Print E-mail

No.

Project Title

Year

1

Rehabilitation and Renovation of Holy Shrine Outskirts Traffic Problems

1999

2

Bojnord City Traffic Regulation Study

1999

3

Birjand City Traffic Regulation Study

1999

4

Land Use Change and its Effect on Traffic conditions

1999

5

5th Traffic Conference Paper Presentation

1999

6

Railway Conference Paper Presentation

1999

7

Gathering Traffic Volume, Car Occupants and Distribution Statistics

1999

8

Geometric Design of Urban Streets and Intersections

1999

9

Mashhad South Beltway Demand and Capacity Data Bank Completion

2000

10

Updating Mashhad Comprehensive Study (1st & 2nd Phase)

2000

11

5th International Civil Congress Paper Presentation

2000

12

Master Degree Thesis Proposal

2000

13

Gathering Traffic Volume, Car Occupants and Distribution Statistics

2000

14

Geometric Design of Urban Streets and Intersections

2000

15

Pedestrian Bridge Design (Sarakhs)

2000

16

Pedestrian Bridge Design (Fahmideh)

2000

17

Gathering Traffic Volume, Car Occupants and Distribution Statistics

2001

18

Managing Temporary LRT Construction Traffic Problem

2001

19

Master Degree Thesis Proposal

2001

20

Traffic Culture Program Planning

2001

21

Updating Mashhad Comprehensive Study (3st & 4nd Phase)

2001

22

City Gate Entrance Volume Counters Statistics Analysis

2001

23

Comprehensive Transportation Office Introducing CD

2001

24

Updating Street Network Software

2001

25

6th Traffic Conference Paper Presentation

2001

26

Geometric Design of Urban Streets and Intersections

2001

27

Pedestrian Bridge Design (Vahdat)

2001

28

Pedestrian Underpass Design (Basidj)

2001

29

Waste Water Collection Design (Bahonar)

2001

30

Me'raj Street Design

2001

31

Special Days Trip Demand Estimation

2002

32

Trip Demand Estimation for 2006-2011-2016

2002

33

City Gate Entrance Volume Counters Statistics Analysis

2002

34

Providing Researches Backbone

2002

35

MTTO Performance Analysis Software

2002

36

Gathering Traffic Volume, Car Occupants and Distribution Statistics

2002

37

Traffic Control Center Development

2002

38

School Students Safety Program

2002

39

Geometric Design of Urban Streets and Intersections

2002

40

Pedestrian Underpass Design (Fajr Park)

2002